Method of statement for Building Construction
Method of statement for Building Construction
Method of statement for Building Construction
A Method Statement for the building construction is a detailed document that outlines how construction activities will be carried out to ensure that the project is completed safely, efficiently, and to the required quality standards. It is the typically includes the following components
(1) – Introduction
1 – Project Overview
Brief description of project including location, scope, and objectives.
2 – Purpose of the Method Statement
Explain why the document is necessary and its intended use.
(2) – Scope of Work
1 – Description of the Work
Detailed description of the construction activities covered by the method statement.
2 – Exclusions
Any activities not covered by this method statement.
(3) – Project Organization
1 – Project Team
Names and roles of the key personnel involved in the project.
2 – Responsibilities
Clear delineation of responsibilities for each team member.
Learn More
Understanding the Responsibilities of Civil Engineers
How to Calculate the Slope of the Stair
Foundation Backfilling types and Procedure
(4) – Risk Assessment
1 – Hazards Identification
List potential hazards associated with construction activities.
2 – Risk Mitigation
Describe the measures in place to the mitigate identified risks.
(5) – Methodology
1 – Detailed Procedure
Step-by-step description of how each construction activity will be carried out.
2 – Sequence of Operations
Order in which tasks will be completed.
3 – Equipment and Materials
List of equipment and materials required, including specifications and handling procedures.
(6) – Health and Safety
1 – Safety Measures
Procedures and precautions to ensure the health and safety of workers and public.
2 – Emergency Procedures
Steps to be taken in the case of emergencies.
3 – Personal Protective Equipment (PPE)
Requirements for the PPE and how it should be used.
(7) – Quality Control
1 – Standards and Specifications
Standards and specifications that the work must meet.
2 – Inspection and Testing
Procedures for the inspecting and testing work to ensure compliance with standards.
Learn More
Classification of Road Markings
What is Concrete Compaction factor test
What Is The RCC Concrete And Properties of RCC Concrete
(8) – Environmental Considerations
1 – Environmental Impact
Potential environmental impacts and how they will be managed.
2 – Waste Management
Procedures for the handling and disposing of waste.
(9) – Communication and Reporting
1 – Reporting Requirements
How progress and issues will be reported.
2 – Meetings and Reviews
Frequency and purpose of the project meetings and reviews.
(10) – Documentation
1 – Records and Logs
Types of the records and logs to be maintained, such as safety inspections, work progress, and the incident reports.
2 – Document Control
How documents will be managed and controlled.
(11) – Training
1 – Training Requirements
Any training required for the personnel to safely and effectively carry out their tasks.
(12) – Review and Approval
1 – Approval Process
Who needs to review and approve the method statement before the work begins.
2 – Review Schedule
How often a method statement will be reviewed and updated.
Example of The Method Statement Structure
(1) – Introduction
1 – Project Name
XYZ Office Building
2 – Location
123 Main Street, City, Country
3 – Purpose
Ensure safe and the efficient construction of the office building.
(2) – Scope of Work
1 – Activities
Excavation, foundation laying, structural steel erection, and etc.
2 – Exclusions
Landscaping & interior fit-out are excluded.
(3) – Project Organization
1 – Project Manager
John Smith
2 – Site Supervisor
Jane Doe
3 – Safety Officer
Mark Johnson
(4) – Risk Assessment
1 – Hazards
Falling objects, working at height, noise.
2 – Mitigation
Use of the safety nets, harnesses, hearing protection.
(5) – Methodology
1 – Excavation
Use backhoe loader to the excavate to required depth.
2 – Foundation
Pour concrete footings and set rebar as per the design specifications.
(6) – Health and Safety
1 – Safety Measures
Safety barriers around excavation sites, 1st aid kits available.
2 – Emergency Procedures
Evacuation plan and emergency contact numbers.
(7) – Quality Control
1 – Standards
Work must comply with ASTM & local building codes.
2 – Inspection
Daily site inspections and the weekly quality reviews.
Learn More
What is the Long Wall Short Wall Method
What is the Differences between Pillar and Column
Civil Engineering Interview Questions and Answers
(8) – Environmental Considerations
1 – Impact
Dust & noise control measures.
2 – Waste Management
Segregation & recycling of the construction waste.
(9 ) – Communication & Reporting
1 – Reports
Weekly progress reports to the project manager.
2 – Meetings
Bi-weekly progress meetings with stakeholders.
(10) – Documentation
1 – Records
Safety inspection logs and progress reports.
2 – Control
Document revisions managed by the project manager.
(11) – Training
1 – Requirements
Safety training for the all site personnel.
(12) – Review and Approval
1 – Approval
Document reviewed and approved by the project manager & safety officer.
2 – Review Schedule
Method of statement reviewed monthly or as required.
This structured approach ensures that all aspects of the construction process are planned & documented, helping to minimize risks & ensure compliance with all relevant standards and Rule regulations.
Other Post
Reinforcement Of The Isolated Footing
Components of Road Structure
Concrete Slump Test workability Procedure and result
Bar Bending Schedule for Beam
How to Create the Bar Bending Schedule Of Slab
What is Civil Engineering Technology?