Land Surveying

Method Of Statement for Survey Works

Method Of Statement for Survey Works

Method Of Statement for Survey Works

(1) – Purpose

This statement outlines the procedure for conducting thorough site surveys of installation facilities and civil works in accordance with project specifications. It includes technical specifications, procedural instructions, and quality control criteria for creating comprehensive site plans for engineering drawings of upcoming projects, or detailed feature mapping of completed facilities. Method Of Statement for Survey Works.

Method Of Statement for Survey Works

(2) – Scope of Work

  • The project will include the surveying of slope embankments and ground levels utilizing GPS / TPS survey methods as deemed appropriate by the Contractor.
  • Additionally, the project will entail mapping the topography of the site with respect to a fixed datum – Ordnance Survey GPS Active Network.
  • All activities will adhere to the guidelines and protocols that govern contractors operating within / on the site, which will be provided during the induction process.

(3) – Hazards Identified

The dangers associated with working in the environment will be outlined in the risk assessment, which include, but are not restricted to.

  1. Underfoot Conditions: Slip/Trip Hazards
  2. Moving Vehicles/Machinery.
  3. Overhead Services.
  4. Stockpiles.
  5. Open Water Bodies Adjacent to site.
  6. Vegetation.
  7. Public Vehicles.

(4) – Equipment & Tools

The following equipment shall be used to the undertake survey:
  • Leica Smart Rover GPS system or the any other suitable brand.
  • Leica TS15 Total Station or the any other suitable brand
  • Leica auto level or the any other suitable brand.

(5) – Working Methods

All survey work will be conducted by the surveyors using GPS Survey receivers, Total Stations, and Auto-level, or any one of them as appropriate.

Sufficient detail must be surveyed to determine the overall topography of the site.

The level detail should be recorded at intervals of 100, 50, 20, or 10 meters, depending on the specific area being surveyed.

Read More

  1. How To Calculate the Quantity Of Concrete Volume Of Staircase

  2. Deflection Angle in Surveying

All survey instruments must be positioned in a way that minimizes disruption to the ongoing work and ensures the safety of the workforce.

The surveyor should adhere to the safety guidelines provided by the site management team, working within the designated ‘zone of safety’ and maintaining constant communication with the site management staff.

The surveyor is responsible for establishing survey control points to facilitate the collection of all necessary data. New control stations should be installed, marked, and documented according to client specifications.

These stations should be located in GPS-friendly areas with clear sky visibility to reduce errors and interference.

In case of any extension of the survey area, a minimum of two control points must be established within the new boundary. For total station work, the instrument should be set up over a known point, referenced to another known point, and a check measurement should be observed and recorded.

The collection of topographic data should be done systematically to ensure efficient data collection and the safety of the surveyor.

All control stations must be observed for at least two epochs of 3 minutes each, with a minimum separation of 20 minutes.

The control stations can utilize either a quick-release tripod or a wooden tripod for stability.

Responsibilities

(1) – Project Manager

The Project manager is ultimately responsible for overseeing all project activities. It is his duty to guarantee that all tasks are completed within the specified time frame, meet quality standards, adhere to safety regulations, and align with the terms of the contract.

(2) – QA/QC Manager

The QA/QC Manager shall oversee the project with respect to all quality requirements. Ensuring the consistency of quality compliance, products and services with reference to all applicable codes and standards.

(3) – Construction Manager

The construction manager is tasked with executing this method statement and supervising all construction activities in accordance with the approved technical documents.

It is his responsibility to confirm that all necessary permits and coordination are completed before commencing work.

Read More

  1. Basics Of Land Surveying

  2. Derivation of formula to set out the curves by the method of ordinates from a long chord

Additionally, he must guarantee that all tasks are carried out in compliance with approved drawings, materials, and skilled personnel.

(4) – QA/QC Engineers

The individual will be tasked with carrying out inspections and verifying materials, workmanship, necessary documentation, assessment, and observing field tests both on-site and off-site in accordance with approved plans and project specifications.

They will also be responsible for identifying any non-conformities and ensuring they are rectified promptly and correctly. .

It is the duty of the person to conduct all necessary inspections and tests as outlined in the approved ITP, as well as to identify any instances of non-compliance and ensure timely and proper resolution.

(5) – Site Engineer

He will oversee supervision tasks and the execution of this method statement, authorized shop drawings, and all other technical specifications, ensuring the quality of materials and craftsmanship.

(6) – HSE Manager

He will guarantee that all activities adhere completely to the project’s HSE requirements. He will execute all duties and responsibilities in accordance with the approved OHS plan for Health, Safety, and Environment Measures.

(7) – HSE Officer

He will guarantee that all activities adhere completely to the project’s HSE requirements. He will execute all duties and responsibilities in accordance with the approved OHS plan and Health, Safety, and Environmental measures.

(8) – Project Engineer

Oversee and coordinate the tasks of the head surveyor to ensure the safety and precision of surveying operations.

(9) – Chief Surveyor

Establish reference points and markers to provide guidance for the development of new infrastructure, such as roads and buildings.

Verify that the project has been completed according to specified measurements and dimensions.

(10) – QC Inspector

Please ensure that the surveying work aligns with or surpasses the dimensions specified in the drawing.

(11) – Safety Officer

It is essential to observe, supervise, and verify compliance with safety and environmental regulations while conducting surveys.

(12) – Compliance to Safety and Protection

Before commencing any work activities, the specified major steps will be meticulously adhered to, following the requisite approval and work permit obtained from the Client.

The Contractor will install guardrails, barricades, lights, and other necessary protective measures to ensure the safety of personnel and the premises.

All reference points, property markers, benchmarks, etc., will be carefully maintained during demolition and earthwork.

Read More

  1. Components of Road Structure

  2. What is contour interval and Uses of contour maps in surveying

Any damage to a reference point during the execution of the work will be repaired or replaced by the contractor. Unless otherwise indicated, all known utilities within the project limits will be located and marked by the Contractor.

During earthwork, all necessary precautions will be taken to protect and preserve utilities scheduled to remain.

In the event of any damage to the existing services/equipment or property during excavation, the contractor will comply with the contract requirements.

(13) – Quality Control

  • It is imperative to maintain cleanliness in the vicinity in accordance with global regulations.
  • All examinations and assessments must adhere to the specified project standards.
  • The customer shall be notified of a site inspection at least 24 hours in advance.

(14) – Test & Quality Records

  • It is necessary for all tests and records to demonstrate adherence to the project quality plan. The client must receive the requirements upon completion of the project.
  • All tests and records must show conformity with the project quality plan. The client is to receive the requirements at the conclusion of the project.

(15) – Attachments

The attachments are to be created during the inspection at the site.
  1. RFI
  2. Calibration Paper
  3. Approved drawing
  4. Pictures

Other Post

  1. how to Calculate the height of an object using With theodolite

  2. What is Best Practice in the Construction

  3. Types of Maps in the Drone Mapping

  4. Thumb rule for Civil Engineers

  5. How To Calculate the Asphalt Quantity For Road

  6. Civil Engineering Interview Questions and Answers

  7. Civil Engineering Basic Field Knowledge


Thank You For Reading This Important Information. Get Benefits And Share With New Commers.

Civil Engineering Tech.

Civil Engineering Technology is Official Educational and Training Page for Engineering Students. Our Mission is to Educate and Keep People Informed by Creating a Trusted Source of Knowledge Everything Related to Civil Engineering.

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button